Two new deliverables are published

The Grace project activities are going ahead as planned, so that in the last weeks two new deliverables have been published, reporting on the main outcomes of Task 2.2 “Development of adaptive controls at local level for the process and the product” and Task 1.3 “Interoperability and ontology design” respectively.

Deliverable 2.2
D2.2 “Implementation of adaptive control algorithms and self-optimization mechanisms at local level”
| February 2012 | Confidential | available soon

This deliverable reports on the implementation of self-adaptation and self-optimization in manufacturing systems and assembly processes at local level, with the aim of increasing process flexibility and improving the handling of unpredictable changes in the production process.

Deliverable 1.3
D1.3 “Document defining the ontology for line production system, integrating process and quality control”
| March 2012 | Public

This deliverable contains the outcome of the Task 1.3, whose main objective is the design of the ontology to support the knowledge representation that will be used by the multi-agent system integrating process and quality control.

Tags: , , ,

This site uses cookies to offer you the best possible navigation experience and for commercial and advertising purposes.
By continuing to use the site without disabling them, you authorise us to send and use cookies on your device. To read our policy on cookies, click here.