Download
Deliverables
Deliverable 1.1
D1.1 “Report with the requirements of multi-agent architecture for line production system and production on-demand”
November 2010 | Public | 770 KB
Deliverable 1.2
D1.2 “Specification of the multi-agent architecture for line-production system, integrating process and quality control”
October 2011 | Public | 3 MB
Deliverable 1.3
D1.3 “Document defining the ontology for line production system, integrating process and quality control”
March 2012 | Public | 1.8 MB
Deliverable 1.4
D1.4 “Implementation of multi-agent based infrastrucure”
September 2012 | Public | 1,4 MB
Deliverable 2.1
D2.1 Summary “Specification for self-adaptation and self-optimization mechanisms in WM production”
February 2011 | Confidential | 340 KB
Deliverable 2.2
D2.2 Summary “Implementation of adaptive control algorithms and self-optimization mechanisms at local level”
February 2012 | Confidential | 560 KB
Deliverable 2.3
D2.3 “Implementation of adapting and optimizing behaviours at global level”
October 2012 | Public | 1.3 MB
Deliverable 3.1
D3.1 Summary “Specification for testing and quality control functions in the WM production”
January 2011 | Confidential | 421 KB
Deliverable 3.2
D3.2 “Self-optimizing/self-adapting quality control agents”
December 2011 | Public | 2.6 MB
Deliverable 3.3
D3.3 “Implementation of modular algorithms for feature extraction and classification”
September 2012 | Public | 2.9 MB
Deliverable 4.1
D4.1 “Document defining the engineering process reference model”
March 2011 | Public | 2 MB
Deliverable 4.2
D4.2 “Definition of the engineering methodology”
April 2012 | Public | 2.8 MB
Deliverable 4.3
D4.3 “Integration of GRACE multi-agent systems with manufacturing CAE systems”
Dicember 2012 | Public | 8.4 MB
Deliverable 5.1
D5.1 Summary “Working prototype of GRACE system installed in the WM production”
January 2013 | Confidential | 426 kB
Deliverable 5.2
D5.2 “Report on the results obtained in the field tests of GRACE MAS platform”
June 2013 | Public | 3 MB
Deliverable 6.1
D6.1 “Project presentation”
December 2010 | Public | 6,5 MB
Deliverable 6.2
D6.2 “Rolling Dissemination and Exploitation Report”
January 2012 | Public | 1 MB
Deliverable 6.3
D6.3 “Final Report on Dissemination and Exploitation”
July 2013 | Public | 1 MB
Deliverable 6.4
D6.4 “Engineering Handbook”
July 2013 | Public | 5 MB
Deliverable 8.1
D8.1 “First Technical Report”
June 2011 | Confidential | 1,7 MB
Deliverable 8.2
D8.2 “Second Technical Report”
June 2012 | Confidential | 220 KB
Deliverable 8.3
D8.3 Summary “Final Technical Report”
July 2013 | Confidential | 200 KB